| By Date |
Alphabetical |
| Workshop Construction - 5/1/2000 | Aileron & Rudder Construction |
| The Kit Moves In - 6/27/2000 | Air Filter |
| Wing Construction - 7/29/2000 | Armrest in the doors |
| Wing to Winglet Join - 12/10/2000 | Baffels and bulkheads |
| Winglet Bottoms - 2/6/2001 | Brake Line |
| Strobe Hardpoints 1 - 2/24/2001 | Cabin Heater |
| Wings, Fill & Sand - 4/18/2001 | Cabin Heater Continued |
| Strobe Hardpoints 2 - 7/14/2001 | Canard Construction |
| Wings, Prime - 8/15/2001 | Canard Tip Fairings |
| Canard Construction - 9/27/2001 | Canard to lower fuselage |
| Wings, Postcure - 10/6/2001 | Carbon Beams |
| Elevator Construction - 11/4/2001 | Center Spar Installation |
| Aileron & Rudder Construction - 2/24/2002 | Cooling Plenum |
| Fuselage Begins - 4/29/2002 | Cowl Seperation |
| Wiring Ducts and Bulkheads - 6/3/2002 | Cowl Wing Opening |
| Seat Hardpoints - 6/16/2002 | Cowl, Piano Hinge |
| Keel - 6/18/2002 | Door Micro Switches |
| Speed Brake - 7/7/2002 | Doors, Fitting |
| Seat Hardpoints -- Removing - 7/11/2002 | Doors, Install |
| Cowl Seperation - 8/12/2002 | Doors, Vanity Covers |
| Center Spar Installation - 8/16/2002 | Elevator Construction |
| Firewall/Bulkhead Reinforcing - 8/28/2002 | Elevator control |
| Landing Light - 9/8/2002 | Elevator Installation |
| Nose Oil Cooler - 9/12/2002 | Elevator Torque Tube Closeout |
| Keel Installation - 10/18/2002 | Engine Assembly |
| Main Landing Gear - 11/2/2002 | Engine Assembly ... Really! |
| Rudder Pedals - 1/23/2003 | Engine Dyno Run |
| Instrument Panel - 1/23/2003 | Engine Install |
| Nose Gear - 1/23/2003 | Engine, Plumbing |
| Elevator Installation - 2/12/2003 | Exhaust |
| Windows, Rear - 4/9/2003 | Firewall/Bulkhead Reinforcing |
| Nose Access Door - 4/29/2003 | Forward Fresh Air Inlet |
| Top Fresh Air Inlet - 5/27/2003 | Fuel Cap Installation |
| Cabin Heater - 6/9/2003 | Fuel probe installation |
| Forward Fresh Air Inlet - 7/9/2003 | Fuel Shutoff Valve |
| NACA Inlets, Engine Cooling Begin - 9/1/2003 | Fuel Sump Tank |
| Windshield installation - 10/13/2003 | Fuel system plumbing |
| Canard to lower fuselage - 12/17/2003 | Fuel Tank, Pressure Test |
| Brake Line - 12/29/2003 | Fuel Tank, Sealing |
| Cabin Heater Continued - 1/30/2004 | Fuselage Begins |
| Fuel Sump Tank - 3/4/2004 | Fuselage finish work |
| Fuel Shutoff Valve - 4/28/2004 | Instrument Panel |
| Canard Tip Fairings - 6/1/2004 | Joining Top and Bottom of Fuselage |
| Joining Top and Bottom of Fuselage - 7/19/2004 | Keel |
| NACA Inlets, Engine Cooling Cont. - 7/19/2004 | Keel Installation |
| Doors, Install - 10/18/2004 | Landing Light |
| Windows, Door - 1/18/2005 | Landing Light, HID |
| Carbon Beams - 3/22/2005 | Main Gear, Fill & Sand |
| Mounting the Canard - 4/15/2005 | Main Landing Gear |
| Elevator Torque Tube Closeout - 6/16/2005 | Mounting the Canard |
| Strakes begin - 8/9/2005 | NACA Inlets, Engine Cooling Begin |
| Baffels and bulkheads - 9/12/2005 | NACA Inlets, Engine Cooling Cont. |
| Fuel probe installation - 10/3/2005 | Nose Access Door |
| Strakes, Flanging Bulkheads - 10/3/2005 | Nose Gear |
| Fuel Cap Installation - 10/23/2005 | Nose Gear Shock Replacement |
| Fuel Tank, Sealing - 10/23/2005 | Nose Oil Cooler |
| Strake, Pilot Side - 11/17/2005 | Oil Access Door |
| Work in the "hell holes" - 1/29/2006 | Overhead plenum |
| Fuel Tank, Pressure Test - 2/8/2006 | Overhead switch panel |
| Armrest in the doors - 2/19/2006 | Pitot installation |
| Doors, Vanity Covers - 3/19/2006 | Rudder Pedals |
| Wheels and brakes - 5/7/2006 | Seat Assembly |
| Overhead plenum - 6/28/2006 | Seat Hardpoints |
| Fuel system plumbing - 6/28/2006 | Seat Hardpoints -- Removing |
| Overhead switch panel - 7/9/2006 | Seat Hinges |
| Elevator control - 7/19/2006 | Speed Brake |
| Cowl Wing Opening - 8/15/2006 | Stainless firewall cover |
| Fuselage finish work - 10/11/2006 | Static Port |
| Doors, Fitting - 11/28/2006 | Strake, Pilot Side |
| Engine Assembly - 1/29/2007 | Strakes begin |
| Pitot installation - 2/18/2007 | Strakes, Flanging Bulkheads |
| Stainless firewall cover - 3/4/2007 | Strobe Hardpoints 1 |
| Vanity Panel - 4/22/2007 | Strobe Hardpoints 2 |
| Seat Assembly - 5/27/2007 | The Kit Moves In |
| Throttle Quadrant - 7/19/2007 | Throttle Quadrant |
| Engine Assembly ... Really! - 9/9/2007 | Top Fresh Air Inlet |
| Main Gear, Fill & Sand - 9/11/2007 | Vanity Panel |
| Cowl, Piano Hinge - 11/4/2007 | Wheels and brakes |
| Engine Dyno Run - 11/5/2007 | Window Frames |
| Engine Install - 12/30/2007 | Windows, Door |
| Engine, Plumbing - 2/1/2008 | Windows, Rear |
| Cooling Plenum - 2/23/2008 | Windshield installation |
| Nose Gear Shock Replacement - 5/26/2008 | Wing Construction |
| Exhaust - 6/30/2008 | Wing to Winglet Join |
| Landing Light, HID - 7/13/2008 | Winglet Bottoms |
| Air Filter - 7/23/2008 | Wings, Fill & Sand |
| Static Port - 8/18/2008 | Wings, Postcure |
| Oil Access Door - 8/24/2008 | Wings, Prime |
| Seat Hinges - 9/2/2008 | Wiring Ducts and Bulkheads |
| Door Micro Switches - 9/28/2008 | Work in the "hell holes" |
| Window Frames - 11/2/2008 | Workshop Construction |